REALISASI KAPAL SANDAR
KADE | NAMA KAPAL | KADE METER | AGENT- PBM | GRT - LOA | TGL JAM MULAI TAMBAT | TGL JAM SELESAI TAMBAT | JENIS BARANG | BONGKAR | MUAT | T HASIL / SISA |
---|---|---|---|---|---|---|---|---|---|---|
A | STUFFING KARET | 000-050 | ||||||||
B | MV. HAI AU 28 | 050-142 | WSA - BUL | 2,995 - 92 | 30-04-2024 08:00 | 08-05-2024 20:00 | BERAS | 4,500 TON | 791 - 1,867 TON |
|
DE | SPBC. TIRTA SAMUDRA XXVI | 170-258 | USDA - KB | 2,217 - 88 | 02-05-2024 07:16 | 07-05-2024 20:00 | PUPUK | 3,300 TON | 412 - 2,492 TON |
|
H | KM. ADRI XLV | 265-317 | TNI - AD | 500 - 52 | 04-05-2024 05:10 | 06-05-2024 06:00 | AMUNISI | BARU SANDAR | ||
I | ||||||||||
TPK II | ||||||||||
TPK I | ||||||||||
PTPN7 | ||||||||||
MSS | ||||||||||
PP LAIS | ||||||||||
LONSUM | ||||||||||
TRIMITRA |
RENCANA KAPAL SANDAR ( HASIL RAPAT OP )
KADE | NAMA KAPAL | KADE METER | AGENT- PBM | GRT - LOA | TGL JAM MULAI TAMBAT | TGL JAM SELESAI TAMBAT | JENIS BARANG | BONGKAR | MUAT | KETERANGAN |
---|---|---|---|---|---|---|---|---|---|---|
POSISI KAPAL LABUH
NO | NAMA KAPAL | AGENT | PBM | GRT | LOA (M) | DRAFT (M) | TANGGAL JAM (OB) | LOKASI LABUH | JENIS BARANG | BONGKAR (TON / M3 / BOX) | MUAT (TON / M3 / BOX) | ASAL | TUJUAN | KETERANGAN | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
KAPAL GENERAL CARGO, CURAH KERING, CURAH CAIR, UNTUK SANDAR DI DERMAGA B s/d E | |||||||||||||||
1 | TB. DRAKO ENTERPRISE /TK.DRAKO 2302 | GUN | TIM | 1,553 | 71 | 3.6 | 30-04-2024 19:00 | SALANAMA | EQUIPMENT | 448 M3 | JAKARTA | KALTIM | |||
2 | KM. BAHARI 35 | SPS | SPP | 2,274 | 89 | 5.8 | 01-05-2024 07:00 | REDE PUSRI | PUPUK CURAH | 3.453 TON | GRESIK | GRESIK | PT.PUSRI | ||
3 | TB. MULTI JASA /TK.CIPTA ABADI | BNM | KCP | 385 | 45 | 3.2 | 01-05-2024 10:00 | REDE PUSRI | PIPA | 581 TON | BATAM | BATAM | |||
4 | MV. FLORA 8 | RMA | KMS | 2.616 | 88 | 5.0 | 03-05-2024 14:00 | REDE PUSRI | KARET MB | TON | SINGAPORE | SINGAPORE | |||
KAPAL BAG CARGO, CURAH CAIR UNTUK SANDAR DI DERMAGA H s/d I | |||||||||||||||
1 | MV. SGS GREEN | RMA | BUL | 2,803 | 92 | 6.2 | 25-04-2024 17:30 | OB | BERAS | 4,500 TON | VIETNAM | THAILAND | BULOG | ||
2 | TB. JM MARINER /TK. WS MARINER | LSM | PTP | 1,274 | 68 | 2.5 | 01-05-2024 10:00 | REDE PUSRI | CPO | 3,200 TON | TARAHAN | TARAHAN | PT.SMART | ||
KAPAL PETIKEMAS (CONTAINER) UNTUK SANDAR DI DERMAGA TPK I s/d TPK II | |||||||||||||||
1 | |||||||||||||||
2 | |||||||||||||||
KAPAL CURAH CAIR (CPO) UNTUK SANDAR DI DERMAGA CURAH CAIR | |||||||||||||||
1 | TK. ALFA SARANA | LPN | PTP | 2,784 | 81 | 2.5 | 29-04-2024 7:00 | OB | CPO | 5,000 TON | BATAM | BATAM | PT.IKI | MUATAN BLM SIAP | |
2 |
Rencana Kedatangan Kapal (ETA)
NO | NAMA KAPAL | AGEN | PBM | GRT | LOA (M) | DRAFT (M) | TANGGAL JAM ETA | JENIS BARANG | BONGKAR (TON/M3/BOX) | MUAT (TON/M3/BOX) | ASAL | TUJUAN | KETERANGAN |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
KAPAL GENERAL CARGO, CURAH KERING, CURAH CAIR, UNTUK SANDAR DIDERMAGA B s.d E | |||||||||||||
1 | TB. BOJOMA 2907 /TK.FLY POWER 3010 | WSA | 3,348 | 92 | 4.5 | 04-05-2024 16:00 | EQUIPMENT | TON/M3 | MALAYSIA | MALAYSIA | |||
2 | MV. AN TRUNG 168 | SDU | 1,599 | 80 | 5.8 | 08-05-2024 16:00 | PUPUK CURAH | 2,950 TON | CHINA | SINGAPORE | |||
KAPAL KEMASAN LOOSE BAG ( SEMEN,PUPUK,GARAM,CPO,ASPAL ) UNTUK SANDAR DIDERMAGA H & I | |||||||||||||
1 | MV. HAI PHUONG SKY | RMA | MTJK | 2,758 | 93 | 6.0 | 06-05-2024 19:00 | BERAS | 4,800 TON | THAILAND | SINGAPORE | BULOG |
|
2 | MV. DAI TAY DUONG 36 | WSA | 2,998 | 92 | 6.0 | 15-05-2024 16:00 | BERAS | 4,800 TON | THAILAND | SINGAPORE | BULOG |
||
KAPAL CONTAINER (PETIKEMAS ) | |||||||||||||
1 | |||||||||||||
2 | |||||||||||||
KAPAL CURAH CAIR (CPO) UNTUK SANDAR DI DERMAGA CURAH CAIR | |||||||||||||
1 | TK . PPKR 99A | JBM | PTP | 2,784 | 81 | 1.0 | 26-04-2024 7:00 | CPO | TON | JAKARTA | JAKARTA | PT.IKI (DOCKING) |
|
2 |